Alliance Steel, LLC, a leader in flat-rolled steel supply and coil processing for over 20 years, announced the relocation of its headquarters from Bedford Park, IL to Gary, IN. The Bedford Park location will cease operations mid-2020.
Alliance plans to compliment the NWI steel community with a high-quality solution for coil processing, distribution, and economic redevelopment by bringing more than 100 jobs to the city of Gary.
“We are extremely excited to begin the next chapter of Alliance Steel at our new state of the art offices and processing facility. We have put ourselves in a highly strategic position for continued growth with proximity to the NWI mills as well as several major ports,” company officials said.
Alliance Steel’s new headquarters occupies 290,000 square feet of warehousing and processing space, including two slitters, Redbud-72” x .500, Braner-72” x .250, a Redbud Stretcher-Leveler, Redbud multi blanking line with Herr-Voss leveler, fiber laser cutting capabilities, shearing, metallurgical testing, cold reduction, and toll processing.
Supply chain solutions include full rail service (inbound and outbound), drive-through bays, and recessed docks for van and flatbed loading. In addition to the impressive processing and supply chain capabilities, the new facility has two large, temperature-controlled coil storage bays.
“We have made several investments in the latest coil processing equipment which will complement an already robust arsenal of capabilities. Our team is very excited to settle in and begin laying down our roots here in Northwest Indiana,” Alliance Steel said.